Posts made in May, 2016

Casino Games

Posted by in Portfolio | 0 comments

Casino Games

I’ve worked on the graphics for a number of casino games and displays, which have been in casinos internationally. Most of the following are games that are played via touch screen terminals that are linked to a network and allow the player to select from available live games around the casino. All the games were designed to support the same interface with a bottom slider that can provide different buttons when the game requires them. This is for both consistency and to make things as...

Read More

Orange Juice Brand

Posted by in Portfolio | 0 comments

Orange Juice Brand

Design work for a brand of orange juice where I have designed the logo, packaging and promotional material. The idea behind this is to make something instantly recognisable as orange juice on a supermarket shelf. The bright orange is used to make it clear what type of beverage it is at first glance, whilst the rest of the design is to look clean, simplistic and appealing. A similar approach was used for the advertisement poster as it’s not necessary to explain what the product is, but to...

Read More

Delorean Project

Posted by in Portfolio | 0 comments

Delorean Project

For this project I modelled a Delorean car to a high level of detail. Accuracy was important but finding detailed images of all parts of the car proved tricky, especially with regards to the interior. Fortunately I was able to locate an actual Delorean car to use as a reference. Being able to take photos of the smallest details and being able to view the car at certain angles was essential to get this model as accurate as possible. The car has a fully modelled interior, with every screw and...

Read More

Hotel Scenes

Posted by in Portfolio | 0 comments

Hotel Scenes

For this project I had to render various parts of a hotel for use in e-learning software. I only had the short time of a month to create three scenes, which means one week on each and the final week to tidy them up and render them out. This was a very tight schedule so I had to manage my time well in order for them to be produced on time, with little room for error. I learned a lot about time management and deadlines from this project but was able to manage it in the time allocated. The first...

Read More